Residual Pressure
Junior Engineer clearing blocked compressor line. Shut valves but did not isolate reservoir. Poked blockage with welding rod. 25-30 bar pressure. Debris punctured arm. Senior Engineers did not know of the blockage. No permit to work, nor tag-out.
This entry was posted
on Monday, December 21st, 2009 at 5:34 pm and is filed under Precautionary Tales.
You can follow any responses to this entry through the RSS 2.0 feed.
Both comments and pings are currently closed.